0812-701-5790 (Telkomsel) Marine Surveyor PT.Binaga Ocean Surveyor (BOS)

0812-701-5790 (Telkomsel) Marine Surveyor PT.Binaga Ocean Surveyor (BOS)
marine surveyor
Anda ingin bisa menghitung berapa jumlah suatu muatan kapal?

Kami akan memberikan kepada anda sebuah program perhitungan muatan kapal dengan cara pembacaan draft mark kapal saja, istilahnya Draft Survey.
Program ini bisa digunakan untuk menghitung muatan di kapal kargo maupun di kapal tongkang atau barge.

Software ini dapat digunakan untuk menghitung semua jenis muatan kapal seperti Batubara, pasir, semen, biji besi, nikel dan lain sebagainya.

Kami juga akan memberikan banyak bonus-bonus berharga kepada anda yang membeli Draft Survey Software ini.

<<<< (gambar tampilan program)

Tunggu apalagi segera miliki software canggih ini Draft Survey Software hanya dengan Rp. 285,000,- saja
diskon khusus bagi anda untuk pemesanan hari ini


Jika anda berminat mendapatkan Draft Survey Software ini bisa menghubungi saya di nomor kontak dibawah ini:


Ruly Abdillah Ginting,
Griya Batuaji Asri Blok X No. 19 - Batam
Email : marine.surveyor.indonesia@gmail.com
Handphone: 08127015790
Yahoo Msg: Chat With Us
Pembayaran bisa dilakukan dengan mentransfer uang ke rekening dibawah ini:
Hanya Rp. 285.000 Saja
Silahkan Lakukan Pembayaran Ke Rekening Dibawah Ini
BCA Cabang Nagoya - Batam
No Rekening : 3403431059
Bank Mandiri Cabang Batam Industrial Park
No Rekening : 1090009967308
Bank BNI Cabang Sei Panas - Batam
No Rekening : 0214822882
Bank Syariah Mandiri - Batam
No Rekening : 7006478144
terima kasih atas kepercayaan anda berbisnis dengan kami, software pesanan anda akan segera kami kirimkan ke alamat email anda.
_________________________________________
Jika anda berminat kami menawarkan paket bundling pembelian program perhitungan minyak ini dan Program Draft Survey Software hanya dengan
Rp. 500,000,-

Cargo Hold Condition & Draft Survey

Cargo Hold Condition & Draft Survey

Marine Surveyor Indonesia - Draft Survey & Cargo Hold Condition always request together prior commencement a loading supervision progress by interest party business likely Shipper, Consignee, Underwriter, P&I Clubs, Ship's Owner or Broker and another interest business party.  

Usually, the Cargo Hold Condition Survey was conduct first then followed with a Draft Survey for initial loading was followed, please find a example report for Cargo Hold Condition Survey and Draft Survey below for your reference only.

Example, A Marine Survey Report of Cargo Hold Condition Survey and Draft Survey on board a General Cargo Ship's MV. PINE 3 while a Loading of bulk cargoes of Granular Urea In Bulk from Pupuk Kaltim (PT. Pupuk Kalimantan Timur) from another a marine surveyor company that i was found from Internet by Google Search Engine as follow;


mv. pine 3
mv. pine 3
The vessel is a single screw, all steel welded General Cargo Vessel, construction built on 2011, registered at Panama with Lloyd’s Register Classification Society. Official number 42327-11-A, and gross tonnage 22,998 tons. Installed 5 (five) cargo holds with TTS weather-tight double skin folding type hatch covers opening direct to forward and afterward with flat top and out-placed hydraulic cylinders. 5 cargo holds are open tween decks and with raised hatch coamings. She was equipped with 5 electro hydraulic deck cranes

During The Cargo Hold Condition Survey perform on board in surveying, the surveyor should be ensure the following term and conditions:
  • Inspections must be carried out during daylight hours only,
  • The Cargo Hatch cover is fully opened,
  • Use of man lifts (where available) to enable proper access to all areas of holds.
  • Appropriate high powered hand held lighting and extendible mirrors should be used to assist in inspections.
  • Free from ANY previous cargo residues
  • Free from loose rust, scale or paint.  Painted surfaces must be properly applied and cured
  • Dry and clean
  • Free from odours
  • In all ways in a suitable condition, fit and safe to receive and preserve the intended cargo
  • Particular emphasis on previous cargo residue on overhead beams, hatch-end beams, hatch joints and hinges, frame brackets, pipe brackets, ladder ways, manhole covers etc
  • It is recommended that where practical, chalk should be used to mark the sides and ends of holds after a section has been inspected to ensure that no part of the superstructure is missed with the movement of the man-lift up and down or sideways for cleaning purposes.
  • Hatch covers should be opened and closed at least 3 times each prior to cleaning, to shake down any remnants of past cargoes.  This action is extremely important if any of the past 3 cargoes have been Agricultural products, specifically grain.
Although not part of a vessel cleanliness inspection it is requested that the following is also checked and reported on:
  • All bilge covers, access covers, tank-top covers should be inspected and properly secured
  • Bilge wells should be clean and dry with pumps in good working order
  • Tank-tops should be free from protrusions, container fittings, pad eyes and the like
  • Hatch covers must be demonstrably watertight with all seals and sealing faces in position and properly maintained
This document is designed as a GUIDE ONLY and covers minimum requirements which should be used by load-port surveyors in conjunction with the surveyor’s own experience, expertise and common sense in order to avoid cargo contamination and loss.

If necessary, this authority includes:
(a) Ability to delay loading of the vessel so inspection is performed in daylight hours
(b) Calling for extra ship’s lighting to assist with inspection
(c) Insisting on provision of mechanical man-lifter to facilitate inspection where available
(d) Interrupt loading after sufficient cargo loaded to enable “walk over” inspection when cargo will subsequently fill hold

As a marine surveyor, it is very important that no indication verbally or in writing is given to the suppliers, owners, agents, masters or their appointed surveyors that you are taking over their responsibility for presenting the vessel ready for loading.

As marine surveyor, any certificate or statement should indicate that you are only certifying that the holds were inspected and found to have been presented clean, dry and apparently grain free in accordance with the terms and conditions of the Charter Party, as stated by the Master

PS: For additional references you could download the following material :
The Standard Club: Bulk Cargoes – Hold Preparation and Cleaning

 

DRAFT SURVEY

The initial draft reading and Initial sounding of ballast water was carried out on board with joint together with attending parties concerned, during the initial draft readings, all de-ballasting operations were ceased, The ballast, fresh water, fuel tanks were sounded in our presence. It was reported by the Chief Officer that the constant is 450 MT. and the consumables as stated below 

The above computations are based on tables found on board and the survey and calculations was carried out in the presence of the vessel’s Chief Officer.

if you interest with a Draft Survey Calculation Program Computation, please visit to Draft Survey Software website at http://draftsurveysoftware.com or read a review of this draft survey software for bulk cargoes on board for your reference and studying, please read at this link website at http://draftsurveysoftware.com/download/preview%20Draft%20Survey%20Ebook.pdf